Quote:
Originally Posted by John D It is not practical, efficient or economic to transmit large electrical loads underground. Large electrical loads are transmitted at 'high voltage' on overhead transmission systems.
John D |
but it must be from the turbines to whatever contraption then gets the electricity in into the national grid or they would do it this way.